Investment Committee Pre-Mortem: A 45-Minute Method
An investment committee pre-mortem is a short exercise run before the vote: everyone assumes the investment has failed, writes down why on their own, and the committee then decides what to do about each reason. Run it for about 45 minutes, have people write before anyone speaks, and end with a log in which every serious failure reason has an owner and a next step: a diligence question, a term to negotiate, a monitoring flag, or an accepted risk. The value is in that log, not in a lower confidence score.
The research is useful but narrow. It shows the method helps groups surface more reasons a plan could fail. It does not show that funds which run pre-mortems make better investments. The sections below cover the evidence, a run sheet, a venture-specific prompt list and the log.
What does the research actually show?
The pre-mortem comes from applied decision research, and most controlled tests of it come from one research group at Michigan Technological University. None of the studies below involve investment decisions. They test plans: field exercises, engineering tasks and security procedures.
- Teams in field exercises. A 2017 master's thesis by Madeline Peabody, Improving Planning: Quantitative Evaluation of the Premortem Technique in Field and Laboratory Settings, ran three experiments. In the first, Army cadets in teams completed six time-constrained field exercises, half evaluated with the pre-mortem and half with a standard military plan review. The abstract reports that teams using the pre-mortem "had fewer fouls and less fixation with no change in planning and execution time."
- Not always better than the alternative. In the thesis's second experiment, 72 individual participants evaluated a group plan with either the pre-mortem or a worst-case-scenario method. There was no statistically significant difference in the number of reasons and solutions generated. In the third, 82 participants generated more reasons with the pre-mortem than with the worst-case method, and groups generated more solutions than individuals.
- Confidence drops. A 2020 poster by Keysor, Wojtyna and Veinott, Premortem: Evaluating two structured analytic techniques for group brainstorming, tested 53 students on a plan to change email passwords after a possible security breach. Those who ran a pre-mortem reduced their confidence in the plan more than a control group or a group that imagined success. A second experiment, with 43 students, found no significant difference between individual and group pre-mortems on confidence.
- What a real session yields. In a 2022 HFES paper, Bettin et al. describe a six-person design team running two back-to-back pre-mortems on a system they were building. The sessions produced 17 and 13 unique failures, and 15 solutions the team judged novel, "not previously considered by any member of the team." The whole process took about 1.5 hours. The authors are explicit that the method cannot ensure a complete list of risks, and that in high-hazard settings it should complement, not replace, more deliberate methods.
Three caveats follow. The samples are small. Much of the work is from one lab and some of it is not peer-reviewed journal research (a thesis, a poster, a conference paper). And a drop in confidence is only useful if the confidence was too high to begin with. A committee that becomes less sure of a good deal has not gained anything unless the new doubts turn into work.
Treat the pre-mortem as a cheap way to widen the list of risks before the vote, not as a forecasting tool.
Why it suits an investment committee
An IC meeting has two habits that hide risks. The deal lead has spent weeks building the case and presents it first, which can anchor everyone else. And dissent in a room of colleagues can come out as soft questions rather than a direct statement that the deal will fail.
The pre-mortem changes the question. "What could go wrong?" invites caveats. "It is three years later and we have written this off. Why?" invites a specific story. Writing silently before discussion also means each partner's reasons are on paper before they hear the deal lead's answers.
It also fits next to work the committee already does. If the memo states theses as claims that can fail and sorts risks by type, as in our investment committee memo structure, the pre-mortem tests whether that risk list is complete.
A 45-minute run sheet
Run it after members have read the memo and before the decision discussion. One person who is not the deal lead facilitates.
| Step | Time | What happens |
|---|---|---|
| 1. Set the frame | 3 min | Facilitator states the failure date and form: "It is three years from today. We have written this investment down to zero." |
| 2. Silent writing | 5 min | Everyone, including the deal lead, writes as many specific reasons as they can. No discussion. |
| 3. Round-robin | 12 min | Each person reads one reason per turn until all are out. Facilitator records them; duplicates are tallied, not debated. |
| 4. Group and rate | 8 min | Group the reasons by type. Each member marks the three they think are most likely and most damaging. |
| 5. Deal lead responds | 7 min | The deal lead says, for the top-rated reasons, what diligence already covers and what it does not. |
| 6. Assign actions | 8 min | For each top reason: an owner and one action type (see the log below). |
| 7. Record | 2 min | Log goes into the deal record with the memo version it was run against. |
Two rules make it work. The deal lead writes reasons too, because they often know the weakest points best. And step 3 is for listing, not defending; the answers come in step 5.
Venture failure prompts to get past the obvious
Committees tend to write the same three reasons: the market was smaller than we thought, the team could not execute, a competitor won. Those may be right, but they are too general to act on. If the list stalls, the facilitator can read prompts like these.
| Area | Prompt |
|---|---|
| Customer | Which named customer or segment stopped buying, and what did they do instead? |
| Founders | What disagreement split the founding team, or which hire never happened? |
| Product | Which technical assumption in the roadmap turned out to be false? |
| Go-to-market | Which unit economic did not hold once the company left its first channel? |
| Financing | Why could the company not raise its next round, and who declined? |
| Terms | Which term in our own deal hurt us when things went wrong? |
| Regulation | Which rule, licence or platform policy changed? |
| Our fund | What did we fail to do as investors: reserves, board work, follow-on discipline? |
| Evidence | Which claim in the memo did we never verify against a source? |
The last two matter because they point back at the fund, not the company. A pre-mortem that only lists company risks misses the decisions the fund controls.
The pre-mortem log
The output is a short table. Keep it with the deal record so it can be read again when the company reports, and at the next financing.
| Failure reason | Likelihood x impact | Covered by diligence? | Action type | Action | Owner | Due |
|---|---|---|---|---|---|---|
| Lead customer churns after pilot | High | Partly: one reference call | Diligence ask | Two more customer calls, one a churned pilot | Associate | Before IC vote |
| Next round fails on burn | Medium | Yes: model reviewed | Term | Size reserves for a bridge; agree milestones | Partner | At term sheet |
| Key engineer leaves | Medium | No | Monitoring flag | Track senior engineering headcount in quarterly reports | Platform lead | Each quarter |
| Pricing undercut by incumbent | Low | Partly | Accepted risk | Recorded; no action | IC chair | n/a |
Each top reason gets exactly one action type:
- Diligence ask. A question to answer before the vote.
- Term. Something to negotiate in the deal itself.
- Monitoring flag. A signal to watch after investing. These feed directly into portfolio monitoring.
- Accepted risk. The committee knows about it and invests anyway. Writing this down is a decision, not a failure.
If a top-rated reason has no action, the committee has not finished.
Common mistakes
- Running it after the decision. Once the vote is taken, the exercise becomes a formality. Hold it before.
- Letting the deal lead facilitate. They will answer reasons as they come up, which ends the listing.
- Measuring success by the confidence drop. The research shows confidence falls. That is a side effect, not the goal.
- Keeping the list but not the actions. A long list of fears with no owners adds anxiety without adding diligence.
- Never reading it again. The log is most useful a year later, when you can check which reasons came true and which the committee missed.
Where AI fits, and where it should not
A language model can help with the mechanics: transcribing the round-robin, grouping duplicates, and drafting the log from the session notes. It can also be asked, after the silent-writing step, to list failure reasons from the memo and data room that nobody raised, each tied to a source document so the team can check it.
Keep it out of step 2. If people see a machine-generated list before they write, they are likely to edit it rather than think. And a model's list of risks is a prompt for discussion, not a finding; every reason it adds needs a person to judge whether it is real.
For funds that want this built into their own committee process, we design fund-specific diligence and IC preparation systems that organise diligence materials, keep source references attached to each claim, and maintain open-question and exception logs in the fund's own templates. The deal team verifies material claims and the investment decision stays with the fund.